Every penetration is part of the fire compartment
An opening through a fire-resistant wall or floor can compromise the entire compartment if it is not protected with a suitable tested system.
The solution depends on the construction, service type, opening size, insulation and required resistance. Installation must follow the selected system documentation.

Cable, pipe and mixed penetrations
A useful enquiry includes drawings or a penetration schedule, wall or floor construction, service details, required classification and programme.
Early coordination protects the required clearances and access for correct installation.
- Cables, bundles and cable trays
- Metal and plastic pipes
- Mixed service penetrations
- Installation control against system conditions
Frequently asked questions
Can one product be used for every penetration?
No. The system must be tested and permitted for the exact construction, service, dimensions and fire-resistance requirement.
What information is needed for a quote?
Drawings or a penetration list, construction type, service data, project requirement, quantities, location and date.
Do you work in existing buildings?
Yes, where the existing condition and a suitable compliant system can be established.